As a result of the heavy rains in Belagavi city and adjoining Maharashtra, the Hindalaga pump house was inundated on 22.07.2021 and the pumps have been shut down.
Work is in progress to quickly relocate and repair the pumps. Therefore, there will be variation in the supply of water to Belagavi city including areas with a 24×7 water supply facility for the next 3 to 4 days.
In the face of such a natural disaster, the public is requested to cooperate. During this problem, the public has been told to drink boiled water. The public has been requested to cooperate with L&T in this regard