Stretch : Construction of 4/6 lane from Km 492.000 of NH-4 to km516.000 of NH-4 Via km 11 of NH-4A (Western Bypass) and km492.000 of NH-4 to km7.5 of SH-54 (Part of Eastern Bypass): Length58.253 km. in the state of Karnataka. (Package-1)
Construction of 4/6 lane from km 7.5 of SH-54 to Km 516.000 of NH-4 (Remaining Part of Eastern Bypass). (Package -2) :
Length : 69.427 km (Package -1: 58.253 km & Package-2: 11.174km)
Start Point :
Package 1: Ch. 492.00 Km of NH-4 near Kamkharatti Village
- Advertisement -
Package 2: Ch. 7.50 km of SH-54 near Kalkambha Village
- Advertisement -
End Point :
Package 1: Ch. 516.00 Km of NH-4 near Bennalli Village and at Ch. 7.50 km of SH-54 near Kalkambha Village
Package 2: Ch. 516.00 Km of NH-4 near Bennalli Village
Lane configuration : 4/6 lane divided carriageway with service road
Proposed row : 60M/30M in Package 2 (As alignment traverse through Reserved Forest Area)
Design speed : 100 Kmph
Type of pavement : Rigid Pavement
Land to be aquired : 550 ha
Cost of Land : Rs.280 cr
Cost of Land to be acquired (Cr.) : “(State Government of Karnataka has allotted 140 Crs towards 50% of total LA cost of the project of length 69.427km)
Total Capital Cost (INR Cr.) : 2792
Per Km Total Capital Cost (INR Cr/km) : 40.24
- Advertisement -
CONSTRUCTION OF RING ROAD / BYPASS TO THE BELAGAVI CITY
(Package-1A)
Stretch : Construction of 4/6 lane bypass for Belagavi city from Km 11.00 (Goa side) of NH-4A to Km 516.000 (Pune side) of NH-4 (Design Length 34.48 km) in the State of Karnataka on Hybrid Annuity Mode. (Package 1A)
Length : 34.480 Km
Start point : Ch. 11.00 Km (Goa side) of NH-4A near Zadshahapur Village
End point : Ch. 516.00 Km (Pune side) of NH-4 near Bennalli Village
Lane configuration : 4/6 lane divided carriageway with service road
Proposed row : 60M
Speed : 100 Kmph
Type of pavement : Rigid Pavement
Land to be aquired : 260 Ha
Cost of land : Rs:73 crores
Cost of land to be aquired : *(State Government of Karnataka has allotted 140 Crs towards 50% of total LA cost of the project of length 69.427km)
Total capital cost : 1094 Cr
Per km total capital cost : 31.70 cr/km